FROM EMPTY ENCLOSURE TO TESTED CABINET
The animation shows the sequence of preparation, installation and testing of the cabinet. The actual site, inspections and assembly are defined within the project scope. → FULL‑SIZE VIDEO · → CONTROL CABINET IN 3D (ROTATE AND DOWNLOAD)
ASSEMBLE THE CABINET — DRAG COMPONENTS ONTO THE DIN RAILS
WHY ORDER IS IMPORTANT
The arrangement on DIN rails affects wire length, service access and separation of power and control circuits. This interactive display is an educational example, not an installation drawing.
INSTALLATION LOCATION AGREED PER PROJECT
The location of fabrication, installation and final connection is determined based on the project, access and agreed scope.
SCOPE BY BUILDING TYPE
Elements, dimensions and connection method derive from the specific building's requirements and approved plan.
CUSTOM SIZE
The size and price of the cabinet depend on the installed components – circuit breakers, contactors, controllers and terminal blocks.
Commonly Installed Components
Circuit breakers and miniature circuit breakers (MCB)
Contactors and differential current protection switches (RCD)
Programmable Logic Controllers (PLC)
Terminal blocks and cable ducts
Signal and control LED lights
Surge arresters (SPD)
RELATED SERVICES
ALL SERVICES →
DOM
Monitoring – DOM
Capture consumption and conditions in rooms within the approved technical scope.
OPEN →
BMS
Building Management System
Regulation of heating, ventilation and lighting according to a timetable.
OPEN →
MEASUREMENTS
Installation Measurements
Inspections and measurements with scope and protocol for a specific installation.
OPEN →